Welcome

The study has shown that about 42,000 MW of hydroelectricity could be generated in Nepal which is feasible techno-economically. Such huge potential of hydroelectricity is due to the perennial rivers flowing from north to south of the country with favorable topographical terrain for the generation of ...

View All

Lodo Khola Small HEP

Lodo Khola Small Hydropower Project has an installed capacity of 1,600 kW. It is a run-of-river type project. The major components of Lodo Khola Small Hydropower Project are- headworks structures, side intake, approach canal, desilting basin, headrace pipe, forbay, penstock pipe, powerhouse, tailrace canal, switchyard, single-circuit 33 kV transmission line. All the components of the proposed ...View All

News & Updates
    Events not available currently
Contact Information
Liberty Energy Company Ltd.
Stock House, Kalikasthan, Kathmandu, Nepal
Tel: +977-1-4543545